Point Loads - Ability to show value divided by 10

10 votes

Most SEOR's want to see the values for the Point Loads on the drawings divided by 10. This makes Value on the drawing smaller so that it can be read easier. In either the Estimate Point Loads interface or the Hanger settings is it possible to have an option to divide the point load value by 10?

Needs more information or votes Hangers Suggested by: Chad Demick Upvoted: 14 Apr, '22 Comments: 0

Comments: 0